Shaughnessy weather

Shaughnessy weather and your roof: big trees, shade and moss

Shaughnessy had the highest tree canopy of any Vancouver neighbourhood in the City's 2022 assessment, 41%, against 25% citywide. Combined with the Vancouver Harbour station's 179.1 days of precipitation a year (1991–2020 normals), that means roofs that stay shaded, damp and covered in leaf litter, which is where moss and rot start.

Reviewed by Scott Plumptree, Director of Marketing, The Interlock Group · Updated October 24, 2026

Consultations on Zoom or at your home. Book a Zoom consultation

Shaughnessy tree canopy

41% in 2022, up from 36% in 2018; highest in the city

2022 Vancouver Tree Canopy Assessment

Precipitation, Vancouver Harbour CS

1,537.4 mm a year on 179.1 days (1991–2020)

Wikipedia, Climate of Vancouver (ECCC normals)

Sunshine, Vancouver Harbour CS

1,818.4 hours a year (1991–2020)

Wikipedia, Climate of Vancouver (ECCC normals)

Homes built before or during WWII

50.9% in Shaughnessy, 23.3% citywide

Wikipedia, Shaughnessy, Vancouver

Shaughnessy has Vancouver's heaviest tree canopy

The 2022 Vancouver Tree Canopy Assessment, prepared for the City, measured Shaughnessy's tree cover at 41%, up from 36% in 2018 and the highest of any neighbourhood. The city as a whole was at 25%. The First Shaughnessy design guidelines put it another way: the number, size and variety of long-lived specimen trees there is "unequalled in any other part of the city."

Those trees are much of why people buy here. For a roof, they mean shade for most of the day, needles and leaves in every valley, and branches overhead in a storm.

How long a Shaughnessy roof stays wet

For Shaughnessy we quote Vancouver Harbour CS, the downtown station with full 1991–2020 normals. It records 1,537.4 mm of precipitation on 179.1 days a year and 1,818.4 hours of sunshine. The airport station to the south is drier, at 1,159.5 mm.

Under a 41% canopy, a roof gets less of that sunshine than an open one. After rain it dries slowly.

Moss and leaf litter on Shaughnessy roofs

Moss needs something to hold onto and water to drink. Cedar shakes and asphalt shingles give it both: a rough surface and a material that holds water. Under Shaughnessy's trees, that is why so many older roofs turn green.

An aluminum panel absorbs nothing, so moss finds no footing, and its smooth face gives litter less to catch on. What still needs a person with a ladder are the gutters, valleys and the uphill side of chimneys, where leaf litter piles up. On a large Shaughnessy lot, a clean-out every autumn is the minimum.

Storms and falling limbs over Shaughnessy's estates

Big trees and big storms are a hard mix. In the Hanukkah Eve windstorm of 2006, BC Hydro reported over 250,000 customers without power at its peak, and falling trees took down power lines and some houses across the Lower Mainland. Earlier, the remnant of Typhoon Freda in 1962 levelled a 2.4-hectare tract of Stanley Park forest.

Interlock® roofs are warranted for wind to 193 km/h (120 mph), installed to manufacturer specification. A falling limb is a tree problem, not a wind problem, so an arborist's look at the trees over the house belongs in any Shaughnessy re-roof plan.

Keeping the slate or cedar look on a Shaughnessy house

About 50.9% of Shaughnessy's homes were built before or during the Second World War, against 23.3% across Vancouver, and many have steep gabled roofs that are part of their character. Owners often want to keep the look of slate or cedar without the weight, upkeep or rot.

Interlock® Slate, Interlock® Cedar Shingle and Interlock® Shake are heavy-gauge aluminum made to read as traditional roofing from the street, at roughly 2 to 3.5 kg per m². In First Shaughnessy, whether a profile and colour are acceptable is for the City's heritage review to decide.

How we specify an Interlock® roof for Shaughnessy

Planned for heavy shade, wet winters and older, steep roofs:

  • Aluminum that holds no water and gives moss nothing to root in
  • Concealed fasteners and four-sided interlocking panels, warranted for wind to 193 km/h (120 mph), installed to manufacturer specification
  • Snow guards planned at the estimate; ice damming is a warranty exclusion
  • A gutter and valley cleaning routine set for your trees
  • Class A Fire Rated Available, as a complete assembly

Shaughnessy questions, answered

Will the trees around my Shaughnessy house still block the gutters with a metal roof?

They will still drop leaves and needles, and some will land in the gutters. A smooth aluminum roof gives litter less to catch on than cedar or asphalt, and nothing grows in what stays. Under Shaughnessy's canopy, plan on clearing gutters at least once a year, usually after leaf fall.

Can an aluminum roof keep the look of slate on a pre-war Shaughnessy house?

Interlock® Slate is made for that. It is formed aluminum with the shape and shadow lines of slate, at roughly 2 to 3.5 kg per m². In First Shaughnessy the City's heritage review decides whether it suits a particular house, and we can bring samples to that conversation.

Does Shaughnessy get enough snow to worry about?

Not often. In the older 1971–2000 normals the harbour station averaged 43.6 cm of snow on 9.6 snowy days. When snow does come, it slides off a metal roof, so we place snow guards over entries, walkways and garages at the estimate.

Ready to plan a Shaughnessy roof?

A fixed price in writing after one visit, on Zoom or at your home. Most BC homeowners choose Zoom. Interlock Metal Roofing (BC) Ltd. · 9969 River Way, Delta, BC V4G 1M8

Interlock metal roofing — get a free quote